Case of Asphalt Mixing Plant
October 15, 2026
- Continuous rise in oil cost, resulting in heavy pressure on production costs.
- Unstable import supply chain with unreliable product delivery.
- Imbalanced cost-performance ratio, and redundant adaptability leading to waste.
The company’s technical team conducts on-site surveys to collect core parameters including the thermal oil heater model, operating temperature, working conditions of system pipelines and oil change cycle of the plant. Combined with the production characteristics of the asphalt building materials industry, a customized replacement solution of AUC‑320 fully synthetic heat transfer oil is provided for customers. The whole process ensures non-destructive replacement, zero equipment damage and uninterrupted production.